|
GENERAL EQUIPMENT INC.
8724 Sunset Drive #191● Miami FL 33173 · USA
|
FLOATING PRODUCTION
TYPE: |
Barge |
DESCRIPTION: |
Floating Production |
PRICE: |
Upon Request |
PACKING: |
As is, Where is |
floating production offloading FPO 25000 BBL/day
From new manufacture
Subject unsold or market withdrawal
Floating Production Offloading (FPO) 25000 BBL/Day)
All the items are "AS IS,
WHERE IS". Buyer is responsible for shipping and handling. Barge equipment is brand new (never used). This barge is an opportunity to invest. Just the ABS Ice reinforce steel hull; US Flag is worth US$3.5 million. All equipment on board was never used. Original price paid in 2010 = US$220,000 million Specs:
This Barge was designed to contain and recover uncontrolled oil and gas subsea well leaks by utilizing a barge carrying oil and gas recovery processing equipment Brage Class:A1 Floating Offshore Installation (FOI), Ice strengthening, Chukchi and Beaufort Seas Coastwise. Mooring System. Eight point catenary spread mooring system with sheaves submerged below ice & ACE winches Cranes. Port side: Sparrows EC1000 (160,600lb capacity), Starboard: Sparrows EC65 (22,000lb capacity) High-Pressure Choke Manifold. High-pressure choke manifold provides well intervention capability via a capping stack. Choke manifold can control flow of hydrocarbons directly from the well to the process and separate water, gas and oil. Gas can be flare. Primarily designed for 25,000 bbl/day, 10,000psi capability. Processing. 3 phase process separates water from gas and oil. Glycol process heaters provide heat to the process and a chemical injection system introduces anti-foam and demulsifying agents to the system.
Flare Boom. Flaring
Capacity: 25,000 bpd of light crude oil, Flaring Time:
continuous 45 days expected maximum Testing. The system is the only existing "offset" deployment source control method, enabling vessel separation from source for shelf response. This equipment has been successfully proven in regulator attended exercises in 2013, 2014 & 2015. Water Run Test performed in 2014 successfully confirmed intake from Containment Dome pumps through the process facilities. Commissioning finalized in 2015 enabling the first US offshore Arctic drilling program. The barge was never used, all equipment is brand new. The barge can work as: Floating Processing Offloading unit (FPO); working couple with a tanker to add storage capacity. As a Support to offshore oil/gas operation. The barge has quarters for 72 people (certify), 4.5 MW electric generation, etc. |
See details at:
oil clean up vessel.pdf
Specification and photos are not contractual and are subject to verification upon inspection
TAKE NOTICE!
PLEASE BE ADVISED THAT INFORMATION INCLUDED IS CONFIDENTIAL IN NATURE AND IS BASED ON PRE-EXISTING BUSINESS RELATIONSHIP WITH THE LEGAL OWNER OF PROPERTY DESCRIBED HEREIN (IF APPLICABLE). AS SUCH, UPON RECEIPT OF SAID INFORMATION THE RECEIVER ACKNOWLEDGES THAT ANY UNAUTHORIZED CONTACT WITH SAID LEGAL SELLER WILL BE CHARACTERIZED AS A BREACH OF CONFIDENTIALITY AND SAID AGREEMENT MAY BE ENFORCED UNDER EXISTING LAW OR IN EQUITY.
This paper was
prepared by General Equipment Inc.
The paper represents an offer of a partner of General Equipment Inc.
All rights are reserved by and for General Equipment Inc.
All
content and ideas of this paper are the property of General Equipment Inc.