|
|
GENERAL EQUIPMENT INC.
8724 Sunset Drive #191● Miami FL 33173 · USA
|
488 MW
|
TYPE: |
Power |
|
DESCRIPTION: |
488 MW Power Plant |
|
PRICE: |
Upon Request |
|
PACKING: |
Ex depot |
488 MW power plant
From new manufcture
Subject unsold or market withdrawal






|
Ansaldo Energia 285 + 203 = 488 MW CCPP - Zero Hours - Ref : P/AA-87 - 1 1 x 285 + 203 = 488 MW Ansaldo Energia , Combined Cycle Power Plants - Highly Suitable for AI / DATA CENTRE APPLICATION
Ansaldo Energia Gas turbine:AE94.2, Gas turbine worker:Ansaldo Energia Year:2017 Hours:0, Frequency:50 Hz Power of Gas turbine generator:185 MW Gas Turbine generator model:QF-180-2 Gas turbine generator workers:Shanghai Electric Ges turbine generator voltage:18 KV Steam turbine workers:Shanghai Electric Steam turbine generator:QF-100-2 Steam turbine generator output:100 MW Steam turbine generator worker:Shanghai Electirc Steam turbine generator voltage:10.5 KV HRSG workers:Hangzhou Boiler Factory HRSG model:NG-AE94.2-R HRSG output steam:241.1t/h HRSG temperature:517°C HRSG max.Pressure:8.89MPA.G Heat rate of CCCP:52% to 53% Scope of Supply : 1) 2 Gas Turbine 185 MW Each with all supporting accessories 2) 2 Alternators With all supporting Accessories 3) 1 Steam Turbine - 100 MW With all supporting Accessories 4) 1 Steam Turbine - 18 MW With all supporting Accessories 5) 2 Steam Turbine Alternatorrs ( 100 MW + 18 MW ) with all auxialiaries
6) Cooler Lube 7) Added Gas+Water treatment Equipments 8) Steam tank+steam 9) HRSG 10) ChimneyTube 11) Fire fighting system 12) High volt cabine 13) Low volt cabine 14) MCC 15) Transformers 16) Tools and Spares it is completed power plant Inspection : Can be arranged , subject to buyer pay USD 7500 Towards our representative travel cost . This amount will be refunded upon successful transaction .
1) Price : USD 92.5 Millions FOB China Port ( For the complete set of equipments including BOP ) 2) Approximate Freight Cost - USD 13.55 Millions - Insurance cost to Buyers account 3) Erection / Commissioning - USD 36.5 Millions Transport charges from Discharge port to Project site is buyers responsibility Item 2 & 3 is budgetary only , final price will be confirmed upon signing of Binding contract Equipment Delivery Time : 2 Months after advance payment Transport Time : 2 Months to the Any safe Port Erection / Commissioning Time : 8 Months after all Equipments arrive at Project site . Terms / Conditions for the Erection/ Commissioning will be informed upon signing of the contract . Payment Terms : 1) 10% deposit into escrow prior to inspection 2) 20% Advance after inspection / Boroscope and upon signing binding contract 3) 25% When equipments are ready for dismantling 4) 25% When equipments are ready for loading into containers 5) 15% When ready for trasport to the Port 6) 5 % When issue shipping documents Payment Terms For Freight / Erection / Commissioning to be discussed separately |
See details at:

Specification and photos are not contractual and are subject to verification upon inspection
TAKE NOTICE!
PLEASE BE ADVISED THAT INFORMATION INCLUDED IS CONFIDENTIAL IN NATURE AND IS BASED ON PRE-EXISTING BUSINESS RELATIONSHIP WITH THE LEGAL OWNER OF PROPERTY DESCRIBED HEREIN (IF APPLICABLE). AS SUCH, UPON RECEIPT OF SAID INFORMATION THE RECEIVER ACKNOWLEDGES THAT ANY UNAUTHORIZED CONTACT WITH SAID LEGAL SELLER WILL BE CHARACTERIZED AS A BREACH OF CONFIDENTIALITY AND SAID AGREEMENT MAY BE ENFORCED UNDER EXISTING LAW OR IN EQUITY.
This paper was
prepared by General Equipment Inc.
The paper represents an offer of a partner of General Equipment Inc.
All rights are reserved by and for General Equipment Inc.
All
content and ideas of this paper are the property of General Equipment Inc.