GENERAL   EQUIPMENT   INC.                    

 

8724 Sunset Drive #191 Miami FL 33173 · USA                                  

Tel: +1 305 468 4650 +33 6 68 96 24 99 · Fax: +1 360 937 2965 +33 8 21 46 30 77                                                  
Email:
info@generalequipment.infowww.generalequipment.info                                                       


 

 

147 MW POWER PLANT 

 

 

TYPE:

Power

DESCRIPTION:

147 MW Power Plant

PRICE:

Upon Request

PACKING:

As is, Where is

 

 

147 mw power plant


Subject unsold or market withdrawal


 

 

POWER TO THE PEOPLE !!!!!

 

For sale immediately:

 

Unbelievable deal , this opportunity will not come along again.....

1 unit  GENERAL ELECTRIC - complete dual fuel open gas power plant with 3 gas turbines

            147 MW fully performance

            Including stand-by Diesel emergency generator

YOB: 2004

Manufacturer: General Electric - US and Norway

Usage: 8.000 hours / excellent condition and instantly available

Heron is a 147 MW dual fuel open cycle gas turbine plant, which is in operation since 2004.

It was the first private power plant in Greece.

A stand-by diesel generator provides emergency power in case of PPC 20 KV power loss.

Thus, the power plant is capable of black-start operation.

The installation also include:

  • Natural gas filtering and pressure reducing station with two streams.

  • Natural gas preheating with heat exchanger and two hot water boilers.

  • Diesel oil storage facility with capacity 2500m³ providing inventory for 5 days operation in case that natural gas is not available.

  • Raw water storage facility with 2x1000m³ tanks and two deep well pumps with capacity 10 m³ /m & 20 m³ /hr each.

  • Demineralised water production plant with capacity 2x30 m³/hr.

  • One 500 m³ carbon steel tank with interior lining and six stainless steel tanks 100 m³ each for the storage of the demineralised water.

  • Two fire water pumps skids for raw and denim water. Each skid consists of one diesel pump, one electric driven pump and one jockey pump.

  • Fire detection and CO2 fire fighting systems for the Gas Turbine housings.

  • Main control building with 20 and 0,4 KV switch boards, MCCs, UPS and batteries and the central control room of the station.

Delivery: as is where is;

Delivery time: instantaneously after visiting

Payment: before loading, according the following installment plan:

30% Down payment after signing the sales contract within 10 days

70% before dismantling and shipping

Warranty: no

Reservation of title: until receiving the entire payment. Extended reservation of title is valid.

Further explanation:

This offer is a very good opportunity to safe almost 80% of the ordinary pricing of such kind of plant.

The supplier will send a team for supervising to the real purchaser for very fair conditions.

We hope to wake your interests in this matter.

* please note: before inspection of power plant ->   L.O.I . And proof of funds required

 

 

Specification and photos are not contractual and are subject to verification upon inspection

 

TAKE NOTICE!

 

PLEASE BE ADVISED THAT INFORMATION INCLUDED IS CONFIDENTIAL IN NATURE AND IS BASED ON PRE-EXISTING BUSINESS RELATIONSHIP WITH THE LEGAL OWNER OF PROPERTY DESCRIBED HEREIN (IF APPLICABLE). AS SUCH, UPON RECEIPT OF SAID INFORMATION THE RECEIVER ACKNOWLEDGES THAT ANY UNAUTHORIZED CONTACT WITH SAID LEGAL SELLER WILL BE CHARACTERIZED AS A BREACH OF CONFIDENTIALITY AND SAID AGREEMENT MAY BE ENFORCED UNDER EXISTING LAW OR IN EQUITY.

 

This paper was prepared by General Equipment Inc.
The paper represents an offer of a partner of General Equipment Inc.
All rights are reserved by and for General Equipment Inc.
All content and ideas of this paper are the property of General Equipment Inc.